Weekly Traffic Advisories
NEW WORK
COLCHESTER COUNTY: Highway 102
There will be intermittent periods of one-lane closures on two sections of Highway 102 for re-paving, from Monday, May 30 to Wednesday, Aug. 31.
Section one is on the southbound lane between exits 13A and 12, and section two in the northbound lane between exits 11 and 12.
Traffic control consists of signs. Work takes place from 7 a.m. to 8 p.m.
Local Area Office: 902-893-5784
Fax: 902-896-2259
CONTINUING WORK
ANTIGONISH COUNTY: Linwood Railway Overpass Bridge
Linwood Railway Overpass Bridge on Trans-Canada Highway 104 is closed on the passing lane for bridge repairs until Tuesday, May 31. The passing lane will remain closed; two way traffic maintained.
Passing lane will be closed for 24 hours. Work will take place from 6 a.m. to 6 p.m.
Local Area Office: 902-756-2697
Fax: 902-756-3458
CAPE BRETON REGIONAL MUNICIPALITY: Barra Strait Bridge
The Barra Strait Bridge on Route 223 at Grand Narrows will have intermittent one-lane closures for repairs until Wednesday, Aug. 31.
Work takes place from 7 a.m. to 6 p.m.
Local Area Office: 902-756-2697
Fax: 902-756-3458
CAPE BRETON REGIONAL MUNICIPALITY: Coxheath Road
Work will continue on the interchange ramps on Coxheath Road until June.
Traffic control persons are in place. A detour is available on Route 4 and Blacketts Lake Road.
Local Area Office: 902-563-2526
Fax: 902-563-2517
CAPE BRETON REGIONAL MUNICIPALITY: Highway 125
Highway 125, from 900 metres east of Exit 4 to 1 kilometre west of Exit 3, will have partial lane closures until Thursday, June 30, for repairs.
Work takes place from 6 a.m. to 8 p.m.
Local Area Office: 902-563-3780
Fax: 902-563-2517
CAPE BRETON REGIONAL MUNICIPALITY: Highway 125
Highway 125, from Meadowbrook Drive at Sydney Mines Town line, Easterly 4.1 kilometres will have a partial lane closure until Thursday, June 30, for repairs.
Local Area Office: 902-563-3780
Fax: 902-563-2517
CAPE BRETON REGIONAL MUNICIPALITY: Route 223
Route 223, from 200 metres east of Scotchlake Road, westerly 2.4 kilometres will have a one-lane closure for repairs until Thursday, June 30.
Traffic control consists of traffic control persons and a pilot vehicle. Work takes place from 6 a.m. to 8 p.m.
Local Area Office: 902-563-3780
Fax: 902-563-2517
CAPE BRETON REGIONAL MUNICIPALITY: Route 327
Route 327, from the turn off to Grand Mira Road South, northerly 4.1 kilometres will have a one-lane closure for repairs until Thursday, June 30.
Traffic control consists of traffic control persons and a pilot vehicle. Work takes place from 6 a.m. to 8 p.m.
Local Area Office: 902-563-3780
Fax: 902-563-2517
GUYSBOROUGH COUNTY: Molasses Harbour Bridge
Molasses Harbour Bridge on Route 316 in Port Felix is reduced to one lane for repairs until Tuesday, Aug. 30. Temporary traffic signals are in place.
Local area office: 902-863-3420
Fax: 902-863-7365
HALIFAX REGIONAL MUNICIPALITY: Highway 103
Work is continuing on the Highway 103 twinning project between Exit 4 at Hubley and Exit 5 at Tantallon.
Minor blasting may occur near exits 4 and 5 between 9 a.m. and 3:30 p.m. until Monday, June 6. Efforts will be made to minimize delays at peak travelling times.
Traffic control will consist of signs and traffic control persons.
Work in the area is expected to continue until the fall.
Local Area Office: 902-835-2702
Fax: 902-835-1860
HALIFAX REGIONAL MUNICIPALITY: Oldham Road and Old Post Road Intersection
Oldham Road and Old Post Road intersection will have a one-lane closure for intersection improvements until Thursday, June 30.
Traffic control consists of control persons. Motorists can expect delays. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-424-0054
Fax: 902-883-8732
HALIFAX REGIONAL MUNICIPALITY: Route 333
Route 333, from Redmonds Road southerly to Paddy's Head Road, will be reduced to one lane for repaving until Sunday, July 31.
Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-424-4670
Fax: 902-424-7116
HANTS COUNTY: Barneys Brook Bridge
Trunk 2, at Barneys Brook Bridge, has a one-lane closure for removal of exiting structure. A temporary bridge is in place. Work continues until Tuesday, Aug. 30.
Detour route available via Highway 102 from Exit 3 to Exit 9. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-883-9789
Fax: 902-883-8732
HANTS COUNTY: Highway 102
Highway 102 will be reduced to one lane from 0.06 kilometres south of the Exit 10 overpass structure southbound to about 0.08 kilometres north of Exit 9 overpass structure including ramps at Exit 10 for asphalt concrete patching and repaving until Wednesday, Aug. 31.
Work takes place from 7 a.m. to 8 p.m.
Local Area Office: 902-424-0054
Fax: 902-883-8732
KINGS COUNTY: Simpson Bridge
Simpson Bridge on Gaspereau River Road is closed for major repairs. A detour is available. Traffic control consists of signs.
Local Area Office: 902-679-6122
Fax: 902-679-6187
LUNENBURG COUNTY: Route 325
Route 325 in Lunenburg County will have alternating lane closures until Friday, June 10. Traffic control will consist of a pilot vehicle, flashing light unit, barrels and traffic cones.
Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-543-7376
Fax: 902-543-5596
PICTOU COUNTY: Carmichael Road
Toney River Bridge on Carmichael Road is closed until further notice. Traffic control consists of signs. A detour is available on Popular Hill Road and Meadowville Station Road.
Local Area Office: 902-485-5254
Fax: 902-485-7047
PICTOU COUNTY: Lamont Road Overpass
Lamont Road overpass on the Trans-Canada Highway 104, between Exit 27 at Sutherlands River and Exit 29 at Barneys River, will have a one-lane closure 24 hours per day until Sunday, June 19, for installation of traffic signals. Traffic control consists of traffic signal lights.
A detour for loads more than 4.7 metres wide will be established and signed for Trunk 4 between Exit 27 at Sutherlands River and Exit 29 at Barneys River.
Local Area Office: 902-752-7907
Fax: 902-752-7908
PICTOU COUNTY: West River East Side Road
The West River East Side Road near Salt Springs is reduced to one lane for repairs until further notice. Traffic control consists of traffic signals.
Local Area Office: 902-755-7060
Fax: 902-755-7049
PICTOU AND COLCHESTER COUNTY: Trunk 4
Trunk 4 from Exit 18A,(near Mount Thom) eight kilometres easterly, will have a one-lane closure for repairs until Monday, Oct. 31.
Traffic control consists of traffic control persons and a pilot vehicle. Work takes place from 7 a.m. to 8 p.m.
Local Area Office: 902-893-5784
Fax: 902-896-2259