Weekly Traffic Advisories
CONTINUING WORK
ANTIGONISH COUNTY: Ohio Cross Bridge
Ohio Cross Bridge at the Cross Roads in Ohio is closed for repairs until Monday, June 30. Traffic control consists of a detour sign.
Local Area office: 902-863-3420
Fax: 902-863-7365
ANTIGONISH COUNTY: Trans-Canada Highway 104
Trans-Canada Highway 104, from West River Bridge westerly 1.85 kilometres will be reduced to one lane in each direction for repaving until Tuesday, July 15. Traffic control consists of traffic control persons. Nightly work takes place from 7 p.m. to 6 a.m.
Local Area Office: 902-863-0364
Fax: 902-863-7482
ANTIGONISH COUNTY: Trans-Canada Highway 104
Trans-Canada Highway 104, from Exit 30 at Beaver Meadow underpass easterly towards Antigonish, has a one-lane closure for repaving until Tuesday, July 15. Traffic control consists of a pilot vehicle. Work takes place from 6 a.m. to 7 p.m.
Local Area Office: 902-863-0364
Fax: 902-863-7482
COLCHESTER COUNTY: Brookside Road
Brookside Road, from Vimy Road to Mountain Lee Road, will have intermittent lane closures for road repairs until Sunday, Aug. 31. Traffic consists of flagmen, signage and a pilot vehicle. Work takes place from 6:30 a.m. to 9 p.m.
Local Area Office: 902-893-5784
Fax: 902-896-2259
COLCHESTER COUNTY: Trans-Canada Highway 104
There will be intermittent periods of east-bound lane closures on the Trans-Canada Highway 104 from 300 metres west of the 102 off ramp to the West North River overpass for repaving until Sunday, Aug. 31. Traffic control consists of signage. Work takes place from 7 a.m. to 8 p.m.
Local Area Office: 902-893-5784
Fax: 902-896-2259
COLCHESTER COUNTY: Route 289
Route 289 in Brookfield, from the railway tracks westerly for 3.7 kilometres, will have a lane closure for repairs until Tuesday, Sept. 30. Traffic control consists of signage. Work takes place from 6 a.m. to 9 p.m.
Local Area Office: 902-893-5797
Fax: 902-896-2259
COLCHESTER COUNTY: Stewiacke Intersection Structure
Stewiacke Intersection structure, southbound, will have alternating lane closures for bridge repairs until Friday, Aug.
- Traffic control consists of a jersey barrier, drums and flashing light units. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-893-6194
Fax: 902-893-6196
GUYSBOROUGH COUNTY: Trunk 7
Trunk 7 from the Halifax County Line to West Liscomb Point Road will have a one-lane closure for paving until Tuesday, Sept. 30. Traffic control consists of a pilot vehicle and traffic control persons. Work takes place from 6 a.m. to 8 p.m.
Local Area Office: 902-533-2771
Fax: 902-533-4352
HALIFAX REGIONAL MUNICIPALITY: Canterbury Truss Bridge
Canterbury Truss Bridge on Bellefontaine Road in Middle Porter's Lake is closed until further notice. A detour is available on Route 207, Trunk 7 and Highway 107.
Local Area Office: 902-860-5615
902-860-5616
HALIFAX REGIONAL MUNICIPALITY: Highway 103
Highway 103, from Indian Lake Bridge to 1.5 kilometres west of Ingramport River will have occasional lane closures for paving until Sunday, August 31. Traffic control consists of traffic control persons. Work takes place from 6 a.m. to 8 p.m.
Local Area Office: 902-835-2702
Fax: 902-835-1860
HALIFAX REGIONAL MUNICIPALITY: Route 333
Route 333, from Indian Point Road southerly to Redmonds Road, will have occasional lane closures for shouldering until Sunday, Aug. 31. Traffic control consists of traffic control persons. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-835-2702
Fax: 902-835-1860
HALIFAX REGIONAL MUNICIPALITY: Route 357
Route 357, from Red's Bridge at Elderbank, northerly toward Middle Musquodoboit, has a lane closure for paving until Sunday, Aug. 31. Traffic control consists of traffic control persons. Work takes place from 6 a.m. to 7 p.m.
Local Area Office: 902-883-9789
Fax: 902-883-8732
HALIFAX REGIONAL MUNICIPALITY: West River Bridge
West River Bridge on Trunk 7 in Sheet Harbour will have intermittent lane closures for maintenance and repairs until Friday, July 18. Traffic control consists of traffic control persons. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-860-5615
Fax: 902-860-5616
HANTS COUNTY: Highway 101, Railroad Overpass
The Highway 101 railroad overpass structure near Stillwater is undergoing repairs until Sunday, Aug. 31. Traffic will be stopped during blasting. Also, motorists are advised there will be trucks crossing Highway 101 near the structure for the duration of the work. Traffic control consists of traffic control persons. A detour is available on Trunk 1, Exit 3 at Mount Uniacke to Exit 4 at St. Croix. Work takes place from 7 a.m. to 8 p.m.
Local Area Office: 902-424-6144
Fax: 902-424-7116
INVERNESS COUNTY: Margaree Harbour Bridge
Crews are working on construction of the new Margaree Harbour Bridge. Motorists using the current bridge should watch for ongoing construction activities in the area. Traffic will be delayed occasionally. Work takes place from 7 a.m. to 7 p.m. The new bridge should be in service by December. The removal of the old bridge should be completed by September 2004.
Local Area Office: 902-295-2700
Fax: 902-295-2617
KINGS COUNTY: Highway No. 1
Highway No. 1 between Morden Road and Greenwood Road will have alternating lane closures for repaving until Thursday, July 31. Traffic control consists of a pilot vehicle and traffic control persons. A detour is available on Highway 101 and Route 221. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-825-4827
Fax: 902-825-3593
PICTOU COUNTY: Carmichael Road
Toney River Bridge on Carmichael Road in Pictou County is closed until Monday, June 30. Traffic control consists of signage. A detour is available on Popular Hill Road and Meadowville Station Road.
Local Area Office: 902-485-5254
Fax: 902-485-7047
PICTOU COUNTY: Joudrey Road
Joudrey Road is closed, except to local traffic, for culvert repairs, until further notice. A detour is available from Louisville Road to Route 6. Work takes place 24 hours-a-day.
Local Area Office: 902-485-5254
Fax: 902-485-7047
VICTORIA COUNTY: Seal Island Bridge
Seal Island Bridge has a one-lane closure for bridge repairs until Wednesday, Oct. 15. Maximum load width at the bridge will be 3.05 metres (10 feet). Traffic control consists of traffic signals. Work takes place 24 hours-a-day.
Local Area Office: 902-674-2146
Fax: 902-674-2170