CONTINUING WORK
ANNAPOLIS COUNTY: Route 201
The Round Hill Bridge will be undergoing structural repairs. Traffic control will consist of signs. The bridge will be closed to loads greater than 21 tonnes. A detour is available on Highway 101 or Trunk 1 between Annapolis Royal and Bridgetown. Work is expected to be completed by Aug. 2.
Local Area Office: 902-825-4880
ANTIGONISH COUNTY: Route 337
Route 337 will have lane closures for upgrading, gravelling and repaving from 500 metres south of Mahoney's Beach Road northerly four kilometres. The Ogden Brook Bridge will also be repaired. Traffic control will consist of a pilot vehicle and traffic control persons. Work will take place from 6 a.m. to 8 p.m. and is expected to be completed by Sept. 30.
Local Area Office: 902-863-0364
CAPE BRETON REGIONAL MUNICIPALITY/VICTORIA COUNTY: Trans-Canada Highway 105
Trans-Canada Highway 105 from Seal Island Bridge, Victoria Co., to Groves Point Road, Cape Breton Regional Municipality, will have a lane closure for resurfacing. Traffic control will consist of traffic control persons. Work will take place from 6 a.m. to 8 p.m. and is expected to be completed by Aug. 2.
Local Area Office: 902-794-5120
COLCHESTER COUNTY: Trans-Canada Highway 104 Eastbound
The eastbound lanes of Trans-Canada Highway 104 from Exit 13 to Crows Mills Overpass will have alternating lane closures for pulverization, shoulder work, guardrail installation, cold planing and paving. Traffic control will consist of flashing lights and signs. Work will take place between 6 a.m. and 9 p.m. and is expected to be completed by Aug. 31.
Local Area Office: 902-893-5797
COLCHESTER COUNTY: Route 336
Route 336, from Route 289 to Southside Road, will be reduced to one lane for seal coating. Traffic control will consist of traffic control persons, flashing lights and a pilot vehicle. Work will take place from 7 a.m. to 8 p.m. and is expected to be completed by July 31.
Local Area Office: 902-893-5797
CUMBERLAND COUNTY: Route 366 (Tyndal Road)
Route 366, from Trunk 4 easterly eight kilometres, will be reduced to one lane for piping, ditching, gravelling and repaving. Work will take place between 6:30 a.m. and 6:30 p.m. and is expected to be completed by Aug. 31.
Local Area Office: 902-667-0366
DIGBY COUNTY: Highway 101
Highway 101 will be reduced to one lane for resurfacing from the Bear River bridge to Exit 26 at Digby. Traffic control will consist of traffic control persons and flashing light units. Work will take place between 7 a.m. and 8 p.m. and is expected to be completed by July 26.
Local Area Office: 902-638-3150
DIGBY COUNTY: Highway 101
The Bear River Bridge on Highway 101 will be reduced to one lane for repairs. Traffic control will consist of traffic lights. The lane closure will be in effect 24 hours a day and is expected to end Aug. 9.
Local Area Office: 902-825-4880
GUYSBOROUGH COUNTY: Trunk 16
Trunk 16 will have lane closures for grading, pulverization and paving from Half Island Cove Road easterly towards Canso. Traffic control will consist of traffic control persons and a pilot vehicle. Delays of 15 to 20 minutes are expected. Work takes place from 6 a.m. to 8 p.m. and is expected to be completed by Aug. 31.
Local Area Office: 902-533-2771
GUYSBOROUGH COUNTY: Larrys Road
Larrys Road will be chip sealed between Route 316, at Larrys River, and Lundy. Traffic control will consist of traffic control persons and a pilot vehicle. Work will take place between 6 a.m. and 8 p.m. and is expected to be completed by July 31.
Local Area Office: 902-533-2771
GUYSBOROUGH COUNTY: Afton Road
The Aikens Bridge on the Afton Road will have a weight restriction of five tonnes until further notice. An alternate route for truck traffic is available by taking Cross Road and North Riverside Road.
Local Area Office: 902-756-3458
HALIFAX REGIONAL MUNICIPALITY: Highway 102 Northbound
Work will consist of concrete deck repairs and shoulder work on the Lakeview Road overpass, Lakeview railroad overpass, Cobequid Road overpass and Waverley Road railroad overpass. Work will take place from 7 a.m. to 7 p.m. is expected to be completed on Sept. 30.
Local Area Office: 902-424-5732
HALIFAX REGIONAL MUNICIPALITY: Highway 103
Little Indian Lake Bridge on Highway 103, between Exit 5 and Exit 6 will be reduced to one lane for bridge repairs. Traffic control will consist of traffic lights. Work will take place from 7 a.m. to 7 p.m. and is expected to be completed by July 26.
Local Area Office: 902-860-5615
HALIFAX REGIONAL MUNICIPALITY: Highway 111
The eastbound and westbound lanes of Highway 111 from Exit 6 at Route 207 (Portland Street) easterly to Route 322 (Pleasant Street), including ramps at Portland Street, will be reduced to one lane for repaving until Aug. 2. Traffic control will consist of traffic control persons, signs and a pilot vehicle. Work will take place from 6:30 a.m. to 6:30 p.m.
Local Area Office: 902-424-4670
HALIFAX REGIONAL MUNICIPALITY: Route 277
Route 277 will have a lane closure for ditching, culvert installation and paving from Antrim Road at Carroll's Corner easterly to the Colchester County line at Gays River. Traffic control will consist of traffic control persons. Work will take place from 7 a.m. to 7 p.m. and is expected to be completed by Aug. 31.
Local Area Office: 902-424-5732
HALIFAX REGIONAL MUNICIPALITY: Route 333
Route 333, from Mills Drive to Brookside Road, will be reduced to one lane for ditching, culvert work and repaving. Traffic control will consist of traffic control persons. Work will take place from 9 a.m. to 4 p.m. and from 5:30 p.m. to 8 p.m., and is expected to be completed by Aug. 31.
Local Area Office: 902-835-2702
HALIFAX REGIONAL MUNICIPALITY: Highway 101
The eastbound and westbound lanes of Highway 101 between Exit 1 at Highway 102 and Exit 3 at Mount Uniacke, will be reduced to one lane for resurfacing. Traffic control will consist of cones, barrels and flashing light units. Work will take place between 7 a.m. and 7 p.m. and is expected to be completed by Aug. 31.
Local Area Office: 902-424-0054
HALIFAX REGIONAL MUNICIPALITY: Northwest Arm Drive
The eastbound and westbound lanes of Northwest Arm Drive will be undergoing cold planing and repaving between Main Avenue and Old Sambro Road. One side of the highway will be closed to traffic during construction, resulting in two-way traffic on the other side of the road. This traffic re-routing will be in effect 24 hours a day. Work will take place from 6 a.m. to 9 p.m. and is expected to be completed by Aug. 31.
Local Area Office: 902-835-2702
HANTS COUNTY: Highway 101
Highway 101 between Mount Uniacke and Ellershouse will have traffic stopped in both directions for brief periods to allow for blasting. Blasting normally takes place between 9 a.m. and 3 p.m. and between 6 p.m. and 7:30 p.m., and will occur until Aug. 9.
Local Area Office: 902-424-0054
HANTS COUNTY: Route 354
Route 354, from Route 202 at Gore to Route 236 at Kennetcook, will be reduced to one lane for ditching, culvert installation, gravelling and paving. Traffic control will consist of traffic control persons and a pilot vehicle. Work will take place between 6 a.m. and 9 p.m. and is expected to be completed by Aug. 31.
Local Area Office: 902-424-5732
INVERNESS COUNTY: Trans-Canada Highway 105
Trans-Canada Highway 105 will be reduced to one lane for cold planing, climbing lane construction and paving near Melford, from Exit 3 westerly about three kilometres. Traffic control will consist of traffic control persons, signs and flashing lights. Work will take place from 6 a.m. to 9 p.m. and is expected to be completed by Sept. 30.
Local Area Office: 902-625-4200
INVERNESS COUNTY: Smithville Road
The Glendyer Bridge on Smithville Road will be closed to traffic for structural repairs. A detour is available by taking Route 252, Trunk 19 and Blackstone Road. The bridge is expected to reopen July 26.
Local Area Office: 902-295-2700
LUNENBURG COUNTY: Route 329
Route 329 will have a lane closure for pulverization, cold planing, gravelling and repaving from Trunk 3 at Hubbards to Mill Cove Park. Work will take place from 7 a.m. to 8 p.m. and is expected to be completed by Aug. 24.
Local Area Office: 902-543-7376
PICTOU COUNTY: Trans-Canada Highway 104 Westbound
The westbound lanes of Trans-Canada Highway 104 will have a lane closure for cold planing, repaving and bridge rehabilitation from the end of twinning east of Exit 25 to the Trans-Canada Highway 106 overpass, including ramps. Work will take place from 6 a.m. to 8 p.m. and is expected to be completed on Sept. 14.
Local Area Office: 902-752-6224
PICTOU COUNTY: River Road
River Road will have a lane closure for pulverization and paving from the Springville Road to the end of pavement. Work will take place from 6 a.m. to 8 p.m. and is expected to be completed on Aug. 31.
Local Area Office: 902-752-6224
PICTOU COUNTY: West Branch Road
West Branch Road will have a lane closure for pulverization, gravelling, cold planing and repaving from Trunk 6 at River John to MacKay Road. Work will take place from 6 a.m. to 8 p.m. and is expected to be completed on Aug. 31.
Local Area Office: 902-752-6224
PICTOU COUNTY: Bridge Avenue
The Albion Mines Bridge over the East River will be reduced to one lane for bridge repairs. Traffic control will consist of signals. Work will take place from 6 a.m. to 9 p.m. and is expected to be completed by Aug. 15.
Local Area Office: 902-893-6194
PICTOU COUNTY: Trunk 4
Trunk 4 will be closed for the replacement of the Upper French River Bridge. A detour is available by taking Trans-Canada Highway 104 between Exit 27 and Exit 29. The closure will be in effect 24 hours a day and the work is expected to be completed by Aug. 4.
Local Area Office: 902-893-6194
VICTORIA COUNTY: Trans-Canada Highway 105
Seal Island Bridge will have a lane closure for deck replacement. Traffic control will consist of traffic lights. Work will take place 24 hours a day and is expected to be completed by Oct. 15.
Local Area Office: 902-674-2146