Weekly Traffic Advisories
CONTINUING WORK
ANNAPOLIS COUNTY: Middleton
Highway 101 will have a one-lane closure, on alternating sides, for repaving between Bridgetown at Exit 21 and Lequille at Exit 22 until Oct. 31. Traffic control will consist of a pilot vehicle and flag persons. Highway 1 can be used as an alternative route. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-825-4827
CAPE BRETON COUNTY: Trunk 4, Big Pond
Trunk 4 from Loch Lomond Road to Glen Albert Road is under construction for upgrading, cold planing, gravelling and asphalt concrete repaving until Oct. 31. There are traffic control and construction signs. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-563-2289
COLCHESTER COUNTY: Bible Hill
Valley Dale Road will have partial closures of up to 30 minutes to erect girders on the New Valley Bridge until Nov 30. Traffic control is supplied. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-893-5784
COLCHESTER COUNTY: Highway 102
Stewiacke Bridge overpass at Exit 11 northbound, on Highway 102, will have alternating lane closures for bridge rehabilitation until Oct. 31. Traffic control will consist of Jersey barrier, drums and flashing lights. Work takes place from 7 a.m. to 7 p.m. and on weekends as required.
Local Area Office: 902-893-6194
COLCHESTER COUNTY: Highway 104
Highway 104, eastbound, at both the North River Bridge and the Route 311 overpass will have alternating lane closures for bridge and overpass rehabilitation until Oct. 31. Traffic control consists of Jersey barrier, drums and flashing lights. Work takes place from 7 a.m. to 7 p.m. and on weekends as required.
Local Area Office: 902-893-6194
COLCHESTER COUNTY: Hilden Road Overpass
The Hilden Road overpass, located about five kilometres south of Exit 13 on Highway 102, will have alternating lane closures for bridge rehabilitation until Oct 31. Traffic control consists of Jersey barrier, drums and flashing lights. Work takes place from 7 a.m. to 7 p.m., and on weekends as required.
Local Area Office: 902-893-6194
COLCHESTER COUNTY: Upper Stewiacke
Route 289 will have a one-lane closure near Upper Stewiacke for paving and bridge repairs until Oct. 31. Traffic control consists of flag persons and a pilot vehicle. Work takes place from 6 a.m. to 9 p.m.
Local Area Office: 902-893-5797
HALIFAX COUNTY: Highway 102
Highway 102, northbound, will have a one-lane closure outbound from Exit 4 at Bedford/Sackville Interchange, to Exit 5 at Fall River for asphalt patching until Oct. 26. Traffic control consists of control persons, cones, flashing light units and barrels. Work takes place from 6 a.m. to 7 p.m.
Local Area Office: 902-424-2831
HALIFAX COUNTY: Highway 102 to Highway 101
Exit ramp 4B from Highway 102 to Highway 101 and exit ramp 1K from Highway 101 to Lower Sackville will both have one-lane closures for ramp realignment until Nov. 15. Traffic control will consist of traffic lights. The Glendale/Duke Street Exit of Highway 102 can be used as an alternative route. Work takes place from 7 a.m. to 6 p.m.
Local Area Office: 902-424-4670
HALIFAX COUNTY: Trunk 3
Trunk 3, Little Indian River Bridge (north), will have a one-lane closure for restoration of structure, including guardrail rehabilitation and deck/girder repair until Oct 31. Traffic control consists of lights. A detour on Highway 103 is available. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-860-5615
HANTS COUNTY: Highway 101
Highway 101 at Mount Uniacke will have traffic stopped in both directions for brief periods in order to allow blasting to take place. Blasting will occur until April 2002. Work takes place from 6 a.m to 7 p.m.
Local Area Office: 902-835-2702
INVERNESS COUNTY: Doyle's Bridge
Doyle's Bridge on East Margaree Crossroads and the Cabot Trail will be closed for repairs until Oct. 25. Traffic control will consist of signage. An alternative route will be made available. Work takes place 24 hours a day.
Local Area Office: 902-295-2700
INVERNESS COUNTY: Port Hawkesbury
Trunk 19 from Campbell Road, northerly about 3.6 kilometres, will have a one-lane closure for pulverization, widening, gravelling and asphalt paving until Oct. 31. Traffic control consists of flag persons and a pilot vehicle. Work takes place from 6:30 a.m. to 7 p.m.
Local Area Office: 902-625-4200
LUNENBURG COUNTY: New Ross
Trunk 12, south of Lake Lawson Road at New Ross, will have alternating lane closures for pulverizing, gravelling and asphalt concrete paving until Oct. 25. Traffic control consists of pilot vehicle and flag persons. Work takes place from 7 a.m. to 7 p.m.
Local Area Office: 902-543-7376
PICTOU COUNTY: MacLellan's Brook
Eureka Bridge on East River West Side Road will be closed until Nov. 17 for bridge repairs. Motorists are advised to use alternate routes. The bridge is closed 24 hours a day.
Local Area Office: 902-755-7147
PICTOU COUNTY: Route 374
Route 374, the Stellarton/Trafalgar Road, from the railway crossing in Hopewell, southerly to Lorne Station Road and Cameron Bridge, will have a one-lane closure for cold planing, gravelling, asphalt concrete paving and bridge replacement until Nov. 16. Traffic control consists of flag persons and signs. Work takes place 24 hours a day.
Local Area Office: 902-752-6224
VICTORIA COUNTY: Seal Island Bridge, Baddeck
One lane will remain open on the Seal Island Bridge, also known as Great Bras d'Or Bridge, while crews conduct deck replacement work. The work will take place until Nov 16. Traffic control will consist of traffic lights.
Local Area Office: 902-674-2146